+400-8110278
International Headquarters:
No. 801 Huagang Road, Wujiang Economic and Technological Development Zone, Suzhou City, Jiangsu Province, China
Global Customer Service Center:
Room 1101, Building 7, Phase 2, Nan'an Xindi, Suzhou Industrial Park, Jiangsu Province, China
No.20306 & 20307, 1st Street, 2nd Floor, East No.3 Gate, Zone 2, Yiwu International Trade City, Zhejiang Province, China
3rd Floor, Plaza No. 157, Main Boulevard, Sector C, DHA Phase 6, Lahore, Pakistan
No. 65A Rustaveli Street, Yakasaray District, Tashkent, Uzbekistan
The capacity of energy storage should be calculated based on the load and power consumption, rather than determined by the proportion of photovoltaic installed capacity. For typical industrial and commercial self-use scenarios, 1MW/2MWh can be taken as the baseline first. System quotations vary greatly depending on regions and supply scope (whether PCS, transformers, civil engineering and installation are included), and publicly released price figures are also prone to becoming outdated. It is recommended that you request budget quotations from suppliers based on your specific single-line diagram, and make horizontal comparisons using the Levelized Cost of Storage (LCOS, i.e. total life-cycle cost divided by total life-cycle discharge capacity), instead of only comparing the initial investment.
Matching capacity according to the proportion of photovoltaic capacity instead of load: The "10% × 2 hours" rule is a policy-derived product, not an engineering result.

Making horizontal price comparisons by nominal kWh: All suppliers should be required to clearly state the available kWh under the agreed DoD (Depth of Discharge), temperature, and end-of-warranty status.
Blindly expanding capacity without a dispatching strategy: Underutilized cycles will push up LCOS (the actual delivery cost per kWh of electricity).
Ignoring the interface mode of PCS/inverter: The choice between a hybrid inverter and an AC-coupled independent PCS will change system losses, control logic and subsequent capacity expansion paths.
Reserving no room for growth: A 10%~20% margin for transformers and PCS should be reserved according to the parallel capacity expansion scheme, instead of replacing the entire system in the fifth year.
You need to provide materials including load data at 15-minute intervals in the past 12 months, the single-line diagram of the existing power distribution system and grid connection point, photovoltaic layout drawings, parameters of modules and inverters, capacity ratio, grid connection voltage level, transformer capacity, and whether grid connection is restricted. Based on the electricity tariff, basic electricity fee, peak-valley periods, grid feed-in tariff, the list of critical loads and the required backup power hours (if backup power is involved), as well as the on-site ambient temperature range, altitude, seismic resistance and protection level requirements, a practical energy storage design scheme can be provided.
What does "1MW/2MWh" mean?
It means the system can output 1MW of power and store 2MWh of electricity. Dividing the capacity by the power gives 2 hours — the system can discharge at full power for 2 hours, or discharge at about 500kW for 4 hours.
Is 1MWh enough for a 1MW photovoltaic system?
It is sufficient in some scenarios. If your electricity bill is mainly composed of short-term peak demand charges, 1MWh is appropriate. But if the goal is to shift the daytime photovoltaic power to nighttime use, or to withstand a 4-hour power outage, 2~4MWh is usually more suitable.
Can a 1MW photovoltaic system operate completely off-grid?
Technically feasible, but it requires a fairly large energy storage capacity — the continuous load usually requires 4~8MWh, and a supporting diesel generator and load management strategy are also needed. During configuration, at least one full day of self-sustainability should be considered, plus backup for consecutive overcast days.