
+400-8110278
International Headquarters:
No. 801 Huagang Road, Wujiang Economic and Technological Development Zone, Suzhou City, Jiangsu Province, China
Global Customer Service Center:
Room 1101, Building 7, Phase 2, Nan'an Xindi, Suzhou Industrial Park, Jiangsu Province, China
No.20306 & 20307, 1st Street, 2nd Floor, East No.3 Gate, Zone 2, Yiwu International Trade City, Zhejiang Province, China
3rd Floor, Plaza No. 157, Main Boulevard, Sector C, DHA Phase 6, Lahore, Pakistan
No. 65A Rustaveli Street, Yakasaray District, Tashkent, Uzbekistan
Grid-connected photovoltaic power generation must be installed by a unit with power construction qualifications, and grid connection permission shall be applied to the local power supply company. Unauthorized modification poses safety risks and makes grid-connected settlement unavailable. The energy storage battery cabinet shall be kept away from fire sources, avoid direct sunlight, and reserve space for ventilation and maintenance. Check the APP data (charge-discharge efficiency, SOC curve) once a quarter, and conduct timely troubleshooting if the cell temperature difference exceeds 5℃ or the annual degradation exceeds 3%.
Cheaper energy storage is always better: Everyone wants to cut costs, but low-cost batteries may only have a cycle life of 2000 times, degrading to 70% in just 3 years, which ends up being more expensive in the long run.

The larger the capacity, the more cost-effective: Many people think buying more capacity is more reassuring, but an oversized battery that cannot be fully charged or discharged will have low utilization rate, thus extending the payback period instead.
Grid-connected systems can still work during power outages: Many people assume that being connected to the grid means higher stability, but conventional grid-connected inverters will shut down for safety when the power is off. For backup power supply, hybrid or off-grid models must be selected.
Place it outdoors under direct sunlight casually: Some people hang it on the wall for convenience, but high temperature is the top killer of batteries, which can double the degradation rate.
Installation guarantees a quick payback: Many people believe the sales pitch of "payback in a few years", but for users with small peak-valley price difference and low self-consumption rate, the payback period may exceed 12 years.
All-in-one machines cannot be expanded: Worrying that extra batteries cannot be added later, in fact, some current modular all-in-one machines support additional cabinets. Just confirm the expansion agreement before purchasing.
Ignore installation qualifications: Thinking "any electrician can install it", but unqualified construction brings safety risks and makes it impossible to obtain grid connection permission (see FAQ).
Only focus on the initial installation price and ignore the warranty: It is easy to be attracted by low prices, but cycle warranty, capacity retention rate and after-sales response are often more valuable than the unit price.
Calculate the load: Pull out the electricity bills of the past 12 months, and calculate the daily average power consumption, the proportion of peak-hour power consumption, and the maximum demand (for industrial and commercial users). This is the starting point for all configurations.
Determine the type: If you only want to save money with favorable local electricity prices → choose grid-connected type; if power outages are frequent or off-grid operation is required → choose hybrid/off-grid type; for industrial and commercial users who need power supply security plus arbitrage → choose hybrid type with demand management.
Configure the capacity: For households, configure the energy storage based on "4-6 hours of power consumption during evening peak hours" (generally starting from 10-15kWh); for industrial and commercial users, configure it based on "the power required for two charges and two discharges for arbitrage" and the site space (common range from 100kWh to several MWh).
Compare brands and after-sales services: Check the cell source, cycle warranty, IP65 rating, and whether there is a local service team.
